PNCDI2
PROJECT COORDINATED BY ICEMENERG|
No.
|
Program |
Acronym |
Project name |
Period
(months) |
No.
Contract
Contractant Authority |
Project Manager |
|
1. |
4.Partenerships
|
Integrated
Informatics System for Reference and Real Parameter
Management for Thermal and Electrical Energy Production
Technological Process, with Automatic Generation of
Exploitation Files from Thermoelectric Power Plants |
36 |
21011-2007
CNMP |
Zachie Frăţilă |
|
|
2. |
4.Partenerships |
Method and Equipment for the Control of
the Electric Generators Connected to the Transport Grid on
the Basis of the Generator-Grid Diagrams |
36 |
21042/2007
CNMP |
Rodica Zlatanovici |
|
|
3. |
4.Partenerships |
Integrated system for assessment of the
hydro generators condition in order to apply the principle
of maintenance according to the condition and for evaluating
the risk in order to establish the insurance value |
36 |
21069/2007
CNMP |
Dan Zlatanovici |
|
| 4. | 4.Partnerships | TIPEB | Innovative technology for obtaining ecological and biodegradable products with dual anti-scaling and anti-corrosion action for the treatment of water in the energy system | 36/2008 |
CNMP |
Angela Stanca |
| 5. |
4.Partnerships 2.Energy |
ELCUAL | Durable protection solutions for the aluminum – copper contacts part of installations for the transmission of electrical energy to insure the energy safety and efficiency | 36/2008 |
22088/2008 UEFISCDI |
Lucia Elena Lăcătuşu |
| 6. | 4.Partnerships | MODEFEN | Measures for increasing energy efficiency in the final consumption sector and methods for their implementation and monitoring | 2009 |
CNMP |
Vasile Rugina |